The List
- Feb 17
- 1 min read
I feel like I'm at the point in the renovation where I need to get a little more organized to get everything finished quickly and properly. I figured I would make my list here so I can stay organized and you can stay informed. Here we go...
In Attic
Take out old fan
Wire new fan
Add exterior vent for fan
Wire light over toilet
Wire light over vanity
Take out old ceiling box
Run wire for new mirror outlet
Add low voltage line to sink and shower walls
Electrical in Bath
Add strip light to niche
Add strip light to under-shelf
Install pendant lights
Install ceiling light above toilet
Wire new outlet behind mirror
Frame new niche and add Hardie board
Waterproof niche and curb
Prime over waterproofed areas
Prime sink
Tile niche and grout
First layer of Ardex
Shower Floor
Shower Walls
Curb
Floor
Base trim
Sink
Second layer of Ardex
One layer of Microcement
Build frame for counter
plumb in sink
Tile counter and backsplash
Clean paint off window
Replace window trim
Add new door trim
Add bi-fold doors
Frost glass on new doors
Finish drywall repairs
Prime Walls and ceiling
Paint Walls and ceiling
Add shelf above sink
Install toilet
Pick and install doors for vanity
Install door hardware
Add toilet paper holder
Towel Hooks
Install shelves/art above toilet
Boy, is that list longer than I thought it was going to be...Let's see how long this takes.